PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Finished installing temporary power to the electrical panel Facing South (800x600).jpg Material, rebar, and shear wall forms (3rd Floor) Facing West (800x600).jpg Tying the rebar mats at Stair -2-Elev. 4 (3rd Floor) Facing South-West (800x600).jpg Underground sanitary sewer roughing at Sprinkler room (152A) Facing South (800x600).jpg Waterproofing alon foundation wall at column line 6.5 (G-D) Facing South-East (800x600).jpg
Previous page Waterproofing alon foundation wall at column line 6.5 (G-D) Facing South-East (800x600)
Waterproofing alon foundation wall at column line 6.5 (G-D) Facing South-East (800x600)